From 72f9f3fdc928dc3ecd223e801b32d930b662b6ed Mon Sep 17 00:00:00 2001 From: Luca Abeni Date: Mon, 7 Mar 2016 12:27:04 +0100 Subject: sched/deadline: Remove dl_new from struct sched_dl_entity The dl_new field of struct sched_dl_entity is currently used to identify new deadline tasks, so that their deadline and runtime can be properly initialised. However, these tasks can be easily identified by checking if their deadline is smaller than the current time when they switch to SCHED_DEADLINE. So, dl_new can be removed by introducing this check in switched_to_dl(); this allows to simplify the SCHED_DEADLINE code. Signed-off-by: Luca Abeni Signed-off-by: Peter Zijlstra (Intel) Cc: Juri Lelli Cc: Linus Torvalds Cc: Peter Zijlstra Cc: Thomas Gleixner Link: http://lkml.kernel.org/r/1457350024-7825-2-git-send-email-luca.abeni@unitn.it Signed-off-by: Ingo Molnar --- kernel/sched/core.c | 1 - kernel/sched/deadline.c | 35 +++++++++++++---------------------- 2 files changed, 13 insertions(+), 23 deletions(-) (limited to 'kernel') diff --git a/kernel/sched/core.c b/kernel/sched/core.c index 423452cae5cf..249e37dc02c8 100644 --- a/kernel/sched/core.c +++ b/kernel/sched/core.c @@ -2051,7 +2051,6 @@ void __dl_clear_params(struct task_struct *p) dl_se->dl_bw = 0; dl_se->dl_throttled = 0; - dl_se->dl_new = 1; dl_se->dl_yielded = 0; } diff --git a/kernel/sched/deadline.c b/kernel/sched/deadline.c index 15abf04bf0b8..c7a036facbe1 100644 --- a/kernel/sched/deadline.c +++ b/kernel/sched/deadline.c @@ -352,7 +352,15 @@ static inline void setup_new_dl_entity(struct sched_dl_entity *dl_se, struct dl_rq *dl_rq = dl_rq_of_se(dl_se); struct rq *rq = rq_of_dl_rq(dl_rq); - WARN_ON(!dl_se->dl_new || dl_se->dl_throttled); + WARN_ON(dl_time_before(rq_clock(rq), dl_se->deadline)); + + /* + * We are racing with the deadline timer. So, do nothing because + * the deadline timer handler will take care of properly recharging + * the runtime and postponing the deadline + */ + if (dl_se->dl_throttled) + return; /* * We use the regular wall clock time to set deadlines in the @@ -361,7 +369,6 @@ static inline void setup_new_dl_entity(struct sched_dl_entity *dl_se, */ dl_se->deadline = rq_clock(rq) + pi_se->dl_deadline; dl_se->runtime = pi_se->dl_runtime; - dl_se->dl_new = 0; } /* @@ -503,15 +510,6 @@ static void update_dl_entity(struct sched_dl_entity *dl_se, struct dl_rq *dl_rq = dl_rq_of_se(dl_se); struct rq *rq = rq_of_dl_rq(dl_rq); - /* - * The arrival of a new instance needs special treatment, i.e., - * the actual scheduling parameters have to be "renewed". - */ - if (dl_se->dl_new) { - setup_new_dl_entity(dl_se, pi_se); - return; - } - if (dl_time_before(dl_se->deadline, rq_clock(rq)) || dl_entity_overflow(dl_se, pi_se, rq_clock(rq))) { dl_se->deadline = rq_clock(rq) + pi_se->dl_deadline; @@ -607,16 +605,6 @@ static enum hrtimer_restart dl_task_timer(struct hrtimer *timer) goto unlock; } - /* - * This is possible if switched_from_dl() raced against a running - * callback that took the above !dl_task() path and we've since then - * switched back into SCHED_DEADLINE. - * - * There's nothing to do except drop our task reference. - */ - if (dl_se->dl_new) - goto unlock; - /* * The task might have been boosted by someone else and might be in the * boosting/deboosting path, its not throttled. @@ -925,7 +913,7 @@ enqueue_dl_entity(struct sched_dl_entity *dl_se, * parameters of the task might need updating. Otherwise, * we want a replenishment of its runtime. */ - if (dl_se->dl_new || flags & ENQUEUE_WAKEUP) + if (flags & ENQUEUE_WAKEUP) update_dl_entity(dl_se, pi_se); else if (flags & ENQUEUE_REPLENISH) replenish_dl_entity(dl_se, pi_se); @@ -1726,6 +1714,9 @@ static void switched_from_dl(struct rq *rq, struct task_struct *p) */ static void switched_to_dl(struct rq *rq, struct task_struct *p) { + if (dl_time_before(p->dl.deadline, rq_clock(rq))) + setup_new_dl_entity(&p->dl, &p->dl); + if (task_on_rq_queued(p) && rq->curr != p) { #ifdef CONFIG_SMP if (p->nr_cpus_allowed > 1 && rq->dl.overloaded) -- cgit v1.2.3-59-g8ed1b